Dormer Scaffold CR

Working safely on the dormer window Extend up to a maximum of 1.3 m
The Custers CR dormer window scaffold offers the possibility of extending up to 2 platforms towards the dormer window. In addition, during installation of the Custers CR dormer window frames, a handrail is created immediately for a safe end result. The special dormer window frame is attached to the scaffold using swivel couplings and supported on the roof with a soft roller. Unlike the so-called swing-out consoles offered by our competitors, there is no annoying diagonal support that could interfere with the gutter construction, for example.

No more dangerous work on your dormer window with the Custers CR dormer window scaffold. Plenty of working space around you at the right height. A price-conscious 2-platform wide solution for your dormer window work!

Mobile Guard

Existing and new users
The Mobile Guard system is ideal for existing and new users and offers the safest and most transparent solution, as the floor is completely closed off every two meters and the familiar bracing pattern is maintained, with the associated flexibility to adapt the scaffolding to the working situation in the event of protruding facade sections, for example.

Temporary guardrail
During assembly, the Mobile Guard moves up to the highest level as a temporary guardrail and can be attached at the highest level as a hip guardrail instead of the horizontal rails.

Assembly instruction video

Scroll to Top