Dormer Scaffold Handy

Extension towards dormer window to a maximum of 4 platforms!
The Handy dormer window scaffold offers the possibility of extending up to a maximum of 4 platforms towards the dormer window. Whereas our competitors’ so-called swing-out consoles are limited to a maximum projection of 2 floors, we go one step further. What’s more, during assembly of the Handy dormer frames, a handrail is created immediately for a safe end result. The special dormer frame is attached to the scaffold using swivel couplings and supported on the roof with a soft roller. The removable end handrail makes it possible to assemble several dormer scaffolds next to each other for an extra-long working floor.

The Handy dormer scaffold from Custers is specially designed for performing maintenance and repair work on dormers. The dormer scaffold can be quickly and safely attached to the dormer. The Custers dormer scaffold can be extended to a maximum of 4 platforms. In addition, the dormer scaffold can also be extended in length.

Mobile Guard

Existing and new users
The Mobile Guard system is ideal for existing and new users and offers the safest and most transparent solution, as the floor is completely closed off every two meters and the familiar bracing pattern is maintained, with the associated flexibility to adapt the scaffolding to the working situation in the event of protruding facade sections, for example.

Temporary guardrail
During assembly, the Mobile Guard moves up to the highest level as a temporary guardrail and can be attached at the highest level as a hip guardrail instead of the horizontal rails.

Assembly instruction video

Scroll to Top