Plasterer scaffold
Specially developed for plasterers and painters!
With the new Custers Stucsteiger, you can build a huge work surface in no time using almost all standard parts. This makes it ideal for working on large surfaces without having to move the platform, saving you time. Because this plastering scaffold consists of 2 Foldy folding scaffolds, you get 3 scaffolds for the price of 1! Perfect for plasterers, but also for installation, assembly, painting, and cleaning work on ceilings. Safe and ergonomic working at a reasonable price.
Two birds with one stone for plasterers and painters
With the new plastering scaffold, you not only get two room scaffolds, but you can also build a huge work surface in no time with almost all standard parts. Ideal for plasterers and painters who can work on a large surface without rolling the platform, saving time!
Mobile Guard
Existing and new users
The Mobile Guard system is ideal for existing and new users and offers the safest and most transparent solution, as the floor is completely closed off every two meters and the familiar bracing pattern is maintained, with the associated flexibility to adapt the scaffolding to the working situation in the event of protruding facade sections, for example.
Temporary guardrail
During assembly, the Mobile Guard moves up to the highest level as a temporary guardrail and can be attached at the highest level as a hip guardrail instead of the horizontal rails.